Tuesday

The weather finally lets us work...

Most of the roof is on, and the siding is nearly completed.  The siding color is actually just the primer, our client is trying to decide on a finish color.  Skylights were cut in today.  We will be moving to the porch areas
next.   Before and after pics of the front below.   

Monday

Modern Kitchen Remodel

This is the before and after of a kitchen remodel. The owners had a clear vision of what they wanted; a complete opposite of what they had. The plan centered around a stainless steel island and a modern feel.
The biggest challenge of the remodel was replacing the old cabinets with new Ikea "do it yourself" cabinets. It turns out, assembly is a little trickier than the instructions suggest. They seem to be very sturdy and a perfect fit for this kitchen.
The homeowners chose gray tile flooring to compliment the stainless steel countertop on the island. The quartz countertops and white tile backsplash provided a good contrast to the dark cabinets and grays seen throughout the kitchen.

How is this for before and after and Covered Bridge Road?







Our client gave us pictures from the house under construction in the early 60s.  The top picture shows the house partially sided with unfinished redwood trim and cedar siding.  The chimney masonry was not completed until after the siding was completed. 

The second picture was taken from the current driveway, still no chimney, and the lid for the cistern was formed but not yet poured. 
The third picture shows the bridge under construction.














Friday

At least the sun was shining!


Things are finally starting to move forward now that the snow has melted and temperature has reached a balmy 43 degrees.  Windows were delivered today, install will start next week, as well as the start of the roof installation.








(jay pretending to work for the camera)

Monday

A few more shots of Saratoga


Its always difficult for us to show a small bathroom without a wide angle lens, but in this shot you can see the new, roomy tile shower. You can also see the small skylight we added since the layout did not allow space for a window.

This picture shows one of the closets and built-in drawer stacks we built in the master bedroom. There is matching set directly opposite.
We were able to modify some old doors we purchased at Architectural Salvage that were a perfect match to the existing doors. We also reproduced the reeded door and window casing that is used throughout this house. It is all original, but it is the first time we have seen it used.

This is just another picture of the outside after the paint job. You can see the small space we had to work with.

Covered Bridge Road continues...


We have begun installing more of the massive, 6x10 beams,... between snow showers and single digit temperatures. Click on any picture for a closer view.

What NOT to do!




Don't take an old deck, install wall sheathing, a rubber membrane, and then top it all off with carpet. The water stuck in the carpet will eventually find its way into the wood.

This job is being re-done with an interesting product called DecTek, http://www.dec-tec.com/products_membranes.cfm

















Small Bathroom Dormer



Before
After (almost, not painted yet)
This a small dormer we built on an older house in the Highlands. The 35 sf dormer allowed us to tuck a small master bath in an area that was previously nearly unusable. More pics to come.

Back to work, between holidays and bad weather


We are slowly moving forward on Covered Bridge Road. The porch finally has a roof and the project is beginning to take shape. Weather permitting we will complete framing this week and begin installing windows next week. The energy efficient windows used on this job qualify for the maximum $1500 tax credit.

Sunday

Covered Bridge Road

We finally started work on our most recent job. We tore of the existing gutterboard and a couple of feet of roof deck. Suprisingly we found a 3/8" thick plywood surface sitting on top of 2x4 truss framing. Probably cutting edge at the time, now the deck must be at least 7/16" per code. Despite the undersized lumber, the roof shows no signs of sagging or other damage. We added new rafter tails so the house will now have an overhang on all sides. We were moving right along until being rained out on Friday. We'll be back this week to
finish up roof framing and begin foundation work.

Thursday

New Job on Covered Bridge Road about to Begin











We are finally about to begin a job we began bidding last November on Covered Bridge Road in Oldham County. The existing home is a very simple farmhouse that was built in the 1950s. Using a design by architect Dan Grimm, we will be adding a huge 2 story screened porch to the side of the house, a new front vestibule and deck, and reworking the mudroom on the left side of the house. The house will also get new windows and a new metal roof. We will post updates as work continues.




Apts for Rent

We have two units for rent, 1 bdrm and 3 bdrm. Please spread the word. Call me for details, Jeff @ 523-8388.

Sunday

Louisville Home Garden and Remodeling Show

The show was a success for us, despite the fact that our booth was hidden behind a children's McMansion playhouse and a giant pirate ship. If you did meet us at the show please call me to set up an appointment.

Monday

Highlands Room Addition and Remodel Complete


Before - This house had one small bathroom on the second floor. The homeowners raised two kids, all sharing the single bathroom for 15 years. Now that the kids are moving away to college, the parents finally decided to build a master suite.




After We only added 200 sf of footprint to the house, but we were able to make a great master suite on the rear of the second floor, a new living room, an expanded kitchen, and a half bath. We built a deck off of the new living room which also created a nice covered patio for the walkout basement.






Crescent Hill Residence to Be Entered into the HBAL Tour of Remodeled Homes!

Room Addition to back of Existing House



New Carriage House



Carriage House Interior Photos:








This project was completed over a two year period. We began inside the original home, remodeling the only bath in the home. We then moved to the living room and converted the dining room into a library. We then moved to the back yard, where we tore down a dilapidated garage and replaced it with a two story carriage house with a loft.

After the carriage house we moved back to the house and built a one story addition on the rear of the home. This gave the homeowners room to add a much needed 1st floor bathroom, a breakfast nook, and a larger living room.